Babylon c. 565 BC: the recordsFindsSourcesMethodData

The Euphrates bridge

Restored completed from the record: a plan, a text or the excavator's reading

A bridge of six brick piers shaped like boats, their prows pointing upstream, carrying a timber walkway across the river. It joined the two halves of the city on the street along Etemenanki's south side.

Pierssix, each 21 x 9 m, 9 m apart; brick in bitumen
Walkwaytimber, at most about 5 m wide
Between abutments126 m
BuiltNabopolassar or early Nebuchadnezzar (unstamped 31 cm bricks)
Found1910-11 by pits and trenches; about 260 clay lamps under its middle

In the model

Piers, spacing and span are excavated (the piers are found work); the walkway's timber and height are restored.

Sources

  1. F. Wetzel, Die Stadtmauern von Babylon, WVDOG 48, with E. Unger on the topographical texts (Leipzig, 1930), pp. 54-57. excavation report open the work ↗six boat-shaped piers 9 x 21 m pointed against the stream; walkway 'höchstens etwa 5 m'; timber between piers
  2. O. Pedersén, Babylon: The Great City (Münster: Zaphon, 2021), ISBN 978-3-96327-136-6, open access, pp. 204-206. study open the work ↗126 m between abutments, six free-standing pillars, dating, lamps
How to cite this record
“The Euphrates bridge”, in Babylon c. 565 BC: the records, version draft (2026), record bridge_arahtu, https://city.babyloniantwins.com/records-site/records/bridge_arahtu.html. Cite the original sources above for the evidence itself.