Lībil-ḫegalla canal
Found excavated; built as the excavators drew it
'May it bring abundance': a brick-walled canal from the Euphrates along the Southern Palace's south wall. The Processional Way crossed it on its own bridge.
| Width | 2.6-2.9 m (3 m at the West Fortification) |
| Walls | baked brick, 2.7-3.3 m thick at the West Fortification |
| Rebuilt | by Nebuchadnezzar 'using bitumen and baked brick' |
In the model
Course and width from the excavation; on the excavated stretch its brick walls are about 2.7 m thick, laid flush with the street. The eastern course is ours.
Sources
- O. Pedersén, Babylon: The Great City (Münster: Zaphon, 2021), ISBN 978-3-96327-136-6, open access, p. 218. study open the work ↗2.9-2.6 m wide, from the river to the middle of the South Palace; the titurru bridge
- R. Koldewey and F. Wetzel, Die Königsburgen von Babylon II: Die Hauptburg und der Sommerpalast Nebukadnezars im Hügel Babil, WVDOG 55 (Leipzig, 1932), S. 29. excavation report open the work ↗channel 2.95-3.10 m, walls 2.70-3.27 m south of the West Fortification
Parts and objects
How to cite this record
“Lībil-ḫegalla canal”, in Babylon c. 565 BC: the records, version draft (2026), record
“Lībil-ḫegalla canal”, in Babylon c. 565 BC: the records, version draft (2026), record
libil_hegalla, https://city.babyloniantwins.com/records-site/records/libil_hegalla.html. Cite the original sources above for the evidence itself.